March 29th, 2024 by WCBC Radio
The Maryland Department of Transportation State Highway Administration will perform patching and paving work on eastbound I-68 at the Creek Road Bridge for one night, Tuesday, April 2 at 7 p.m. All lanes should be reopened by 5 a.m., April 3, weather permitting. A detour route will require drivers to take Exit 77 through Hancock and then enter onto I-70 east. Triton Construction will use variable message signs, cones, drums, and temporary traffic signs to guide motorists through the work zone.